the big city
the studio tours were very interesting
the weather was miserable
lunch was delicious
i was really glad that i went
but it really messed up my schedule and my sleep
i had trouble sleeping the night before, my brain would NOT turn off
and i had to get up at 6 so that i could be downtown at 7:30 to catch the bus
the bus ride was about 2 and a half hours each way
because we got a pokey bus driver, who also got lost on the way home
it was a long day
and it has taken me a few days to recover from the sleep deprivation
between the lack of sleep lately
and not having a proper kitchen=not so healthy diet
and not having or making the time to go to yoga
i feel like i am not running under optimum circumstances
i feel like my brains aren't working right
i have much to do
i hope it's a productive day
KITCHEN UPDATE
cabinets are all installed
bought a new stove, and a new faucet
josh was able to rig up a temp sink
so we no longer have to wash our dishes in the utility sink in the basement
countertops (and sink) were measured for yesterday
and they said 2 weeks!
so we could have our new kitchen in 2 weeks!!
we still have to do lighting
and some wiring
and some painting
but, soon soon soon...
the weather was miserable
lunch was delicious
i was really glad that i went
but it really messed up my schedule and my sleep
i had trouble sleeping the night before, my brain would NOT turn off
and i had to get up at 6 so that i could be downtown at 7:30 to catch the bus
the bus ride was about 2 and a half hours each way
because we got a pokey bus driver, who also got lost on the way home
it was a long day
and it has taken me a few days to recover from the sleep deprivation
between the lack of sleep lately
and not having a proper kitchen=not so healthy diet
and not having or making the time to go to yoga
i feel like i am not running under optimum circumstances
i feel like my brains aren't working right
i have much to do
i hope it's a productive day
KITCHEN UPDATE
cabinets are all installed
bought a new stove, and a new faucet
josh was able to rig up a temp sink
so we no longer have to wash our dishes in the utility sink in the basement
countertops (and sink) were measured for yesterday
and they said 2 weeks!
so we could have our new kitchen in 2 weeks!!
we still have to do lighting
and some wiring
and some painting
but, soon soon soon...
0 Comments:
Post a Comment
<< Home